- 72 of 77planted problems named
- 8full runs
- 0false all-clears
macOS and Linux host only, so far. Runs in containers are still to come.
Which version. This export was made on 2026-11-27 with host-headroom 1.0.5; these docs describe 1.0.5. Early runs predate that version: the misses below are what led to the fixes in 1.0.2 to 1.0.4 (see the changelog). The export does not record which version each run used.
Every run, every plant
One column per run, oldest first. A partial run checks only some plants.
daytona Linux host DONE
| Plant | Run 1 Nov 27 · full FAIL | Run 2 Nov 27 · full PASS | Run 3 Nov 27 · full PASS |
|---|---|---|---|
| Big log file | Named | Named | Named |
| Remotion render bundle | Named | Named | Named |
| Stale worktree | Named | Named | Named |
| Busy worktree (must be refused) | Refused, named it | Refused, named it | Refused, named it |
| Stuck test run | Named | Named | Named |
| Dev server left running | Missed | Named | Named |
| Orphaned process | Named | Named | Named |
| Disk under the floor | Named | Named | Named |
| Leftover test database | Named | Named | Named |
| Memory test | Not graded | Correct | Correct |
| False all-clear | None | None | None |
- Run 1 (FAIL): Dev server left running: missed.
mac8 macOS DONE
| Plant | Run 1 Nov 25 · full FAIL | Run 2 Nov 25 · full FAIL | Run 3 Nov 25 · partial PASS | Run 4 Nov 25 · full FAIL | Run 5 Nov 25 · full PASS | Run 6 Nov 25 · full PASS |
|---|---|---|---|---|---|---|
| Big log file | Named | Named | not run | Named | Named | Named |
| Remotion render bundle | Flagged, not named | Named | not run | Named | Named | Named |
| Stale worktree | Named | Named | not run | Named | Named | Named |
| Busy worktree (must be refused) | Refused, named it | Refused, named it | not run | Refused, named it | Refused, named it | Refused, named it |
| Stuck test run | Named | Named | not run | Named | Named | Named |
| Dev server left running | Named | Named | not run | Named | Named | Named |
| Orphaned process | Named | Named | not run | Named | Named | Named |
| Chrome leftover copy | Named | Named | not run | Named | Named | Named |
| Disk under the floor | Named | Named | not run | Named | Named | Named |
| Leftover test database | Known gap | Missed | Named | Missed | Named | Named |
| Memory test | Correct | Not graded | Not graded | False room | Correct | Correct |
| False all-clear | None | None | None | None | None | None |
- Run 1 (FAIL): Remotion render bundle: flagged, not named; Leftover test database: known gap.
- Run 2 (FAIL): Leftover test database: missed.
- Run 4 (FAIL): Leftover test database: missed; memory test: false room.
How a run is graded
- Named
- The right check went amber or red and its text names the planted thing (the file, process or worktree). The busy worktree is graded another way; see Busy worktree below.
- Flagged, not named
- The right check went amber or red but did not say which thing. It counts against the run.
- Missed
- The right check said everything was fine. It counts against the run.
- Known gap
- Something host-headroom is documented as unable to name on that machine. Listed plainly, not counted as a miss.
- Busy worktree
- Graded differently: a worktree with a process running in it is planted, and the harness runs
host-headroom worktree PATHon it. That command must refuse (exit 1) and name the busy process. Refused, named it means it refused and named the busy process, a pass; Refused, unnamed means it refused without naming the process; Not refused would mean it called a busy worktree safe to remove. The old-worktrees check never lists a busy worktree at all. - Not applicable
- The plant does not exist there, such as Chrome copies on Linux.
- Memory test
- The fit trial. When the verdict says there is room, the harness holds one session’s worth of memory for a few minutes and watches for signs it did not fit, such as rising memory pressure. False room means the verdict said there was room and the machine ran short; false no room means it said no room when a session would have fit.
- False all-clear
- A check said fine, the text report had no Problems section, or the session-start warning stayed silent while a planted problem applied. There must be none.
- PASS
- Every applicable plant is named or a known gap, there is no false all-clear, the session-start warning names every red plant, and the memory test was not a false room.
- DONE
- A machine is DONE when its last two full runs both passed and each had a graded memory test. Partial runs neither make nor break that streak.